| Project Name | Construction of salt water transmission line |
| Location / Country | TARSUS / MERSİN - ADANA |
| Employer | Soda San A.S. Soda Factory |
| Scope of Contract | Approximately 54 km long transmission line construction work; Suction cup structure 59 pieces / Drainage structure 58 pieces / Valve room 7 pieces / Horizontal drilling 7 pieces |
| Date of contract | 14.09.2017 |
| Cost of project | 37.664.123 TL |