CONSTRUCTİON OF SALT WATER TRANSMİSSİON LİNE

Project Detail


Project Name Construction of salt water transmission line
Location / Country TARSUS / MERSİN - ADANA
Employer Soda San A.S. Soda Factory
Scope of Contract Approximately 54 km long transmission line construction work; Suction cup structure 59 pieces / Drainage structure 58 pieces / Valve room 7 pieces / Horizontal drilling 7 pieces
Date of contract 14.09.2017
Cost of project 37.664.123 TL