| Project Name | General Directorate of State Hydraulic Works İzmir Transmission Line Section 3 |
| Location / Country | İZMİR / TÜRKİYE |
| Employer | General Directorate of State Hydraulic Works |
| Scope of Contract | 17 km long 2.000-1.800-1.200 mm diameter steel pipeline, 20.000 m³ capacity loading tank, 1.900 m long 3 mt. diameter Buca tunnel |
| Date of contract | 03.01.2014 |
| Cost of project | 40.613.740 TL |